Chiller Plants Unit

Air Cooled Chiller

Tata Communications Ltd.

📍 Dighi, Pune, India(Data Center)

SCOPE: EXECUTION

Capacity: 450Tr (Tons of Refrigeration)

🏗 Structure: IT Building No. 4

Piping Network: Heavily insulated chilled water lines. Equipment Setup: Multi-tier structural steel framing for pipes.
Storage Tank: Large spherical, insulated thermal storage tank .

Liftwell System

Stages of Implementation

Stage I – Pre Design Stage / Case Study

  • Understand the Architect’s / Client’s basic requirement.
  • Site Survey.
  • Preparation of Preliminary Estimate.

Stage II – Designing & Proper Planning

  • Heat Load Calculations.
  • Equipment Selection.
  • Preparation of HVAC concept layout.
  • Freeze GFC drawing.

Stage III – Coordination

  • Review & Progress Meetings.
  • Coordination with other services.
  • Inspection & Supervision.
  • Preparation of joint measurement sheet.

Stage IV – Handing Over & AMC

  • Testing & Commissioning.
  • Preparation of handing over document manual.
  • Check List & AMC tracker.